In the recent months, we've seen that many buildings folded in city together with the apartment house in Someshwaranagar throughout August, 2013. the bottom and seven floors building below construction folded owing to poor quality of labor. to cut back price of construction and to induce additional returns, specifications of building materials and style isn't adhered to by the builders. The result's terrible loss on investment created and also the amounts advanced by several patrons of flats. during this case the failure was additionally to poor quality of labor, four unauthorized floors designed on the sanctioned ground and 3 floor building. The project has 3 blocks all with such poor quality of labor.

Very high land values are ascertained in city that is undergoing speedy development owing to migration from alternative elements of the State also as alternative elements of the country. The population at the moment is 10 million that is anticipated to extend to 13 million by the year 2021.   The steerage values for registration of properties are being inflated by the government currently then to boost its money resources. The patrons ar forced to remit the inflated stamp values. Such patrons recover the extra quantity spent on stamp worth after they sell the area within the new building or sell the property later.

Reasons for buildings collapse:
1) Poor soil conditions:- once the soil conditions don't seem to be smart, soil take a look at is to be conducted to understand the utmost load that it will carry per sq ft. Normally, soil capability of one.50 tons / Sqft is found to be satisfactory. If the soil conditions ar poor, sand piles to consolidate the soil ar provided. For larger structures, concrete piles / concrete rafts ar provided at the bottom of the muse per load projected within the style of the structure. additionally, engineers offer an element of safety to require care of any deficiency within the quality of building materials or the development.

2) designed up space of the building:- Floor space quantitative relation (FAR) is prescribed within the partitioning / Building laws per the land use zone, space of the positioning, location, road width, etc.Some builders increase the designed up space quite the sanctioned decide to get additional returns. Normally, extra support space, extra floors just like the Someshwaranagar living accommodations and conversion of automobile parking space, etc. ar ascertained to extend the designed up space.

3) Earth tremors: it's necessary to style high-rise buildings for resistance to Earth tremors to stop collapse and avoid disaster.


Enforcement of building regulations:
Hundreds of engineers are utilized in BBMP from the amount of junior engineers to superintending engineers to enforce building laws in their jurisdiction additionally to their engineering works.the world junior engineers and assistant govt engineers are responsive to all the buildings bobbing up in their jurisdiction.  Action isn't taken in most of the cases of violation within which builder/owner is co-operating with their demands. In cases wherever complaints ar created and there's pressure to require action they advise the house owners to get keep orders from Court, once that the builders happily proceed with the development and  the BBMP is generally isn't keen to induce the keep orders vacated..The case can proceed with the plaintiff and also the builder following the case within the court. it's going to or might not be a real grievance. it's going to be to extract cash from the builder and in some cases from the engineer involved to avoid message.

Procedure for action to be taken on violations/ unauthorized construction:
The Karnataka Municipal Corporations (KMC Act), 1976, has the subsequent provisions for sanction of buildings and also the social control of building laws.

1. once a grievance is received or violations are ascertained by the officers, a provisionary order (PO) below Section 321(1(iii) of the Karnataka Municipal Corporations (KMC) Act, 1976 is issued to the owner/builder to demolish the work unlawfully dead or create such alterations to bring the work into conformity with the Act, rules, byelaws or conditions in sanction and to not proceed with the work.  PO notice issued is to indicate cause why the PO shouldn't be confirmed.

2. If the owner or builder fails to indicate cause to the satisfaction of the Commissioner/authorized officer, the PO order could also be confirmed. This order is termed Confirmation Order (CO) Notice.

3. In cases of urgency, a notice not but twenty four hours is given to demolish/alter the work unlawfully done.

4. below Section 462 of the Act, if the owner /builder haven't complied with the orders, the Commissioner might order such work of removing desecrated parts or demolition to be dead by BBMP.

5. below Section 463, the expenses incurred for execution of the order could also be recovered from the owner/builder.

Verification by buyers:
Buyers investment their hard-earned cash or loan taken from the banks ought to verify whether or not the property projected to shop for is allowed and there's no risk for the money.

A)Title documents:
It is necessary to verify whether or not the vendor is that the approved owner of the property by confirmatory the documents together with the most recent BBMP khatha, land tax receipt, and also the latest encumbrance certificate. If the property is below joint possession, all the involved need to sign the sale document, or power of professional obtained and verified.

b)Master set up provisions:
The approved program is to be verified to ascertain whether or not the property is within the involved land use zone or permissible uses. just in case of amendment in land use, it's to be verified, whether or not the order is from the government.

c) Land acquisition:
It is necessary to verify whether or not the property is noninheritable  or notified for acquisition by BDA, Karnataka Industrial Area Development Board (KIADB) or alternative public agency by confirmatory the operative, if any, is issued by that agency.

d)Sanctioned plan:
The set up Sanctioned by BBMP is to be verified to understand whether or not the projected building is sanctioned, the aim that it's sanctioned, the quantity of floors, the set backs, parking areas, designed up space etc. whether or not the look of the flat/commercial unit projected to be purchased is shown within the actual construction plan, and whether or not it's in conformity with the sanctioned set up.

e)Violations of the set up Provisions:
On verification if it's found, that there are violations from the sanctioned set up, the customer might drop the concept of shopping for the property no matter be the reassurance of the builder/property owner that they'll regularize the building from BBMP by paying the penalty.

f)Structural safety:
If it's a multi-storied building, whether or not a professional structural engineer has designed the building needs to be verified.


Before creating balance payment, the customer needs to verify whether or not occupation certificate from the BBMP is obtained for completion of the building all told respects.